IDEF ZERO

Node A6 · Acronym decoder

PCA

Physical Configuration Audit

What it actually means

The audit establishing that the as-built product matches its design documentation — drawings, parts lists, software versions — so the product baseline being committed to production is the thing that was actually verified. FCA asked "does it meet requirements?"; PCA asks "is it what the drawings say?"

Where you'll meet it

Development closeout, before full-rate production commitment.

Related terms

← All systems engineering acronyms